Planning & management of data-center moves
We create the overall plan: sequences, responsibilities, time windows and risks — and on moving day we orchestrate everyone involved, from the electrician to the application owner.
- Overall project plan with clear responsibilities
- Risk analysis and rollback scenarios
- Coordination of all trades and providers
- Command and communication on moving day
Inventory & migration concept
Before the move comes the inventory: which systems exist, what do they depend on, what may fail together? From this we derive a wave plan with realistic downtime windows.
- Complete inventory of all systems
- Dependency and criticality analysis
- Wave planning with downtime windows
- Alignment with business units and operations
Execution with minimal downtime
Where possible we replicate data in advance and switch over in a controlled way — instead of turning everything off and hoping. Every step has a defined cutover and a test afterwards.
- Data replication in advance where technically possible
- Moves in night and weekend windows
- Defined cutover points per wave
- Functional testing after every step
De-/installation, transport & commissioning
Professional dismantling, insured transport, clean reassembly: racks, cabling and systems are set up at the destination so that restart is smooth and documented.
- Professional dismantling and packaging
- Insured specialist transport
- Rack assembly and cabling at the destination
- Restart, testing and acceptance