Why move with IFS

A data-center move is a project, not a transport

The boxes are the smallest problem. What is critical are dependencies between systems, the right order and the moment everything has to come back up. We come from the storage and infrastructure world — which is why we plan moves from the data, not from the logistics.

What we deliver

The four building blocks of our relocation service

Planning & management of data-center moves

We create the overall plan: sequences, responsibilities, time windows and risks — and on moving day we orchestrate everyone involved, from the electrician to the application owner.

  • Overall project plan with clear responsibilities
  • Risk analysis and rollback scenarios
  • Coordination of all trades and providers
  • Command and communication on moving day

Inventory & migration concept

Before the move comes the inventory: which systems exist, what do they depend on, what may fail together? From this we derive a wave plan with realistic downtime windows.

  • Complete inventory of all systems
  • Dependency and criticality analysis
  • Wave planning with downtime windows
  • Alignment with business units and operations

Execution with minimal downtime

Where possible we replicate data in advance and switch over in a controlled way — instead of turning everything off and hoping. Every step has a defined cutover and a test afterwards.

  • Data replication in advance where technically possible
  • Moves in night and weekend windows
  • Defined cutover points per wave
  • Functional testing after every step

De-/installation, transport & commissioning

Professional dismantling, insured transport, clean reassembly: racks, cabling and systems are set up at the destination so that restart is smooth and documented.

  • Professional dismantling and packaging
  • Insured specialist transport
  • Rack assembly and cabling at the destination
  • Restart, testing and acceptance
How we work

Four steps into the new data center

Inventory

Inventory, dependencies and criticality of all systems are recorded.

Concept

Wave plan, downtime windows and rollback scenarios are defined.

Move

Controlled execution wave by wave — with tests after every step.

Restart

Systems run at the destination, documented and accepted.

Free tool

How big will your relocation project be?

Our Migration Planner estimates consulting days, project duration and transfer windows for your migration — based on data volume, number of systems and complexity. In two minutes, exportable as PDF.

Estimate your move now
Frequent questions

Data center relocation — in short

How long does a data-center relocation take?

It depends on the number of systems, data volume and complexity — from a few weeks for a server room to several months for grown environments.

Can a move happen entirely without downtime?

Rarely entirely without. But with data replicated in advance, smart waves and night/weekend windows, the noticeable downtime can often be reduced to hours instead of days.

Do you also handle partial moves or single racks?

Yes — from a single storage system to individual racks to the complete site.

Next step

Planning a move?

The earlier we take a look, the calmer moving day becomes — reply within one business day.